How to write a brief for better proposals

What a brief or RFQ must say to get good proposals: the problem, the measures of success, budget and time. Six sections, five mistakes and a template to copy.

Xterra EdzeEditorial

Published

An open blank notebook beside a tray of pens and a small plant on a dark desk.
Write the brief before the work starts.Photo: Kelly Sikkema on Unsplash

The brief is the most useful document in a project. An hour spent making it clear saves weeks of proposals that answer different questions, and months of work on the wrong problem. The good briefs we read share one shape.

Start with the problem, not the solution

“We need a new website” is a solution. “Prospects cannot tell which of our three products fits them, so sales spends the first call explaining it” is a problem. It invites better answers. Design practice keeps the problem open before choosing a solution: the Design Council’s Double Diamond spends its first half discovering and defining it.1 UK government service teams run a discovery phase before committing to a build.2

Six sections a brief needs

  1. The problem: what is happening, for whom and what it costs today.
  2. The people: who uses the result and who decides. Write each need in this form: as a [person], I need [something] so that [outcome].3
  3. What success looks like: the two or three measures you will report, with a baseline if you have one.
  4. Scope and what already exists: brand assets, systems, data, content and contracts that must stay.
  5. Constraints: budget range, the deadline and its reason, regulation, security reviews, languages and markets.
  6. How you will decide: who is involved, the steps with their dates and what you need in a response.
Four people reviewing printed documents at a wooden table.
Everyone who works on the project will read the brief. Write it for them. Photo: Andreea Avramescu on Unsplash

Give a budget range and a deadline

A range is enough. It lets each respondent propose the best work you can afford, instead of guessing and pricing too high or scoping too little. Deadlines work the same way: a launch tied to a trade show is a firm date. “As soon as possible” is not, and tends to buy the most expensive version of everything.

For an RFQ, publish the scoring

In a formal request for quotation or proposal, list the scoring criteria, their weights and how many respondents you will invite to present. You get comparable proposals and fewer clarifying questions.

Approach and understanding of the problem
35%
Team and relevant experience
25%
Delivery plan and risk
20%
Price
20%

An example weighting. Set your own and publish it with the brief.

Five common mistakes

  • A solution written as the problem, so every proposal looks the same.
  • Twenty “must-haves” in no order, so none of them gets priority.
  • No measure of success, so nobody can tell whether it worked.
  • Context held back until after selection, when it changes the scope.
  • A deadline with no reason behind it, set before the work was understood.

A template you can copy

markdown
# Brief: <project name>

## The problem
What is happening, for whom, and what it costs today.

## The people
Who uses the result · who decides · who else is affected.

## Success
The 2–3 measures we will report, and today's baseline.

## Scope and what exists
In scope · out of scope · assets, systems and contracts that stay.

## Constraints
Budget range · deadline and why · compliance · languages and markets.

## Decision
Steps and dates · who decides · how responses are scored · what to send.
Paste it into a document, fill in what you know and mark the gaps.

When you are ready, our brief form follows the same sections and takes attachments. You can also download the template as a text file first.

Sources. Where the facts come from.

Numbered as they are cited in the text. Each link opens the original.

  1. Writing user stories

    GOV.UK Service Manual

    Back to the text

Tell us what you need built.

You will speak to a lead who would run the work, and get a straight answer on fit.

Book a call

Three ways to start

  1. 01About 2 minutes

    A quick question

    You get A reply from a named lead

  2. 02About 8 minutesRecommended

    A project brief

    You get Options and a first scope after one call

  3. 03About 15 minutes

    A formal RFQ or RFP

    You get Receipt confirmed and a named bid lead

Every engagement starts with a written scope and a quote agreed before work begins. How each package is priced