Capability 01 of 05 · Before anyone commits

Design Consulting & Solutioning

A new capability is not a plan. Shape it before you build it.

Design Consulting & Solutioning turns an ambition or a new capability into something a team can actually ship. Routes are drawn to the same level of detail, tested with the people who will use them and sized with the engineers who would build them, so the one chosen survives contact with delivery.

Typical length
4–8 weeks
Format
Advisory · solutioning
Standard
Decision-ready output
Solution map · Your companyIllustrative

An illustrative solution map: five capabilities placed on three roadmap phases for three routes, with effort, running cost and risk compared; the compose route is recommended.

Route B · ComposeCompose proven services around the core: 9–13 weeks, lowest change risk. Recommended.

What it covers · 6 parts

Six ways in, one decision at the end

Every engagement ends the same way: a recommended route, the rejected ones recorded, and enough detail for finance and engineering to agree on it.

Sticky notes sorted into columns on a whiteboard during a solutioning workshop
01 / 06

Experience & capability assessment

Your product, research practice, design system, accessibility and measurement scored against where the roadmap needs them to be.

Scored baseline
02 / 06

Solution shaping

Two or three routes to the same outcome, each drawn as a journey, a system sketch and an effort range, so the comparison is like for like.

Options · trade-offs
03 / 06

Design sprints

One or two weeks to take a vague ambition to a tested prototype, with the customers it is meant for in the room before the week ends.

1–2 weeks
04 / 06

Build, buy or compose

Platform and tooling choices judged on the journeys they have to support, the cost of changing them later, and what your team can run without us.

Evidence-led selection
05 / 06

Design operations

Intake, critique, handover, design QA and the working ratio of designers to engineers, set up so good work does not depend on who is on the call.

DesignOps
06 / 06

Accessibility advisory

A WCAG 2.2 AA programme: audit, prioritised backlog, component-level fixes, team training and an accessibility statement you can publish.

WCAG 2.2 AA

How it runs

Six weeks from ambition to a costed route

Options stay open until there is evidence to close them. Nothing is recommended that engineering has not sized.

  1. Frame Wk 01

    The decision to be made, the constraints that are real rather than assumed, the people affected and what success looks like twelve months out.

    • Decision brief
    • Constraint map
    • Success measures

    Gate · Is this the right decision to make?

  2. Explore Wk 01–03

    Current journeys, systems and data reviewed with the teams who own them. Two or three candidate routes drawn to the same depth.

    • Current-state map
    • Route options
    • Risk log

    Gate · Are the routes drawn to the same depth?

  3. Test Wk 03–05

    The leading routes prototyped and put in front of users and engineers. Effort, running cost and risk estimated against what the prototype revealed.

    • Prototypes
    • Research findings
    • Effort & cost model

    Gate · Did users and engineers back the leader?

  4. Recommend Wk 05–06

    One route recommended, the rejected ones recorded with their reasons, and a phased plan with the operating model needed to run it.

    • Recommendation
    • Phased plan
    • Decision record

    Gate · Can finance and engineering both sign it?

Timings are typical and shorten when the evidence already exists.

Route comparison · what you will see

Three routes, scored on the same five questions.

The artefact the steering group signs: each route drawn to the same depth, so the choice is between options, not between a favourite and two straw men.

Route comparison · Your company · v4Illustrative
Route comparison · Your company · v4
QuestionA · Extend the current portalB · New self-serve appC · Buy and configure
Time to first release10–12 weeks (Passes)16–20 weeks (Watch)8–10 weeks (Passes)
Three-year cost rangeMedium (Passes)High (Watch)Medium, rising with seats (Watch)
Covers the top five user needs3 of 5 (Fails)5 of 5 (Passes)4 of 5 (Passes)
Riskiest assumptionLegacy API holds load (Watch)Team can hire two engineers (Watch)Vendor roadmap fits (Fails)
Reversible if wrongYes (Passes)Partly (Watch)Costly (Fails)
Recommended: B, with A as a 10-week bridgeIllustrative example of the comparison we produce. Estimates are ranges agreed with your engineers, not quotes.

What you keep

A decision you can defend. And the files behind it.

The route you chose, the ones you did not and why: kept in your own workspace so the reasoning survives the people who made it.

Hand-drawn wireframes of a web page and its sections on a sketchbook, an orange pen beside it
The routesdrawn to the same depth

/handover/01-consulting/

Design Consulting & Solutioning

  • Capability assessment & scorecardDeck · Sheet
  • Current-state experience mapFigma
  • Solution options with trade-offsDocument · Figma
  • Prototype used for testingFigma · coded
  • Effort, cost & risk modelSheet
  • Target operating model & DesignOps planDocument
  • Phased roadmap & decision recordRoadmap · ADR

/handover/README

In every handover

  • Decision record, with evidence linksDoc
  • Assumption tracker, final statesSheet
  • Research consent & retention logSheet
  • Walkthrough session, recordedVideo

What changes

Fewer surprises after the decision. Three measures that show it.

Consulting succeeds when the estimate holds, the risky assumptions were tested first and design requests stop arriving sideways. Baseline, target and instrument are agreed in week one.

  1. Outcome 01

    A route you can cost

    Options compared like for like, sized by the engineers who would build them, with the assumptions written next to the numbers.

  2. Outcome 02

    Fewer reversals later

    The expensive assumptions are tested in week three, while changing course still costs a week rather than a quarter.

  3. Outcome 03

    A team that can run it

    Rituals, roles, intake and handover written down, so the plan does not depend on us still being here.

Outcome review · Your companyIllustrative
  • 01 Estimate spread, chosen routeRange width as % of midpoint, first sizing vs final
    22%from 60%target 25%
  • 02 Assumptions tested before the decisionShare of logged high-risk assumptions with evidence
    82%from 15%target 75%
  • 03 Design requests through intakeShare of work entering by the agreed route, week 12
    88%from 30%target 80%
Scale 0–100 on every row; row numbers match the outcomes. Figures are illustrative examples of the measures we set, not client results.

The stack

Workshops, maps and estimates. In the tools you already run.

We map, estimate and record decisions where your product and engineering teams already work, most used first. Technologies we work with, not partnerships.

  • Figma
  • Miro
  • Notion
  • Confluence
  • Jira
  • Linear
  • Storybook
  • Lighthouse
  • Google Analytics
  • PostHog
  • Mixpanel
  • Playwright

Frameworks we build to

Every route is costed against the same bar. Accessibility and privacy included.

Frameworks each route is scored against before it is recommended. They are frameworks we build to, not certifications we hold.

  • WCAG 2.2 AAWeb Content Accessibility Guidelines

    Perceivable, operable, understandable and robust content, including 2.2 criteria such as focus not obscured, target size and accessible authentication.

    How we apply itContrast, focus order and target size checked in the design file, then keyboard and screen-reader passes on every key journey before sign-off.

  • Core Web VitalsLoading, interactivity and visual stability

    Good at the 75th percentile of page loads: LCP ≤ 2.5 s, INP ≤ 200 ms, CLS ≤ 0.1.

    How we apply itLCP, INP and CLS budgets written into the design spec per template, and checked at p75 in field data after release.

  • ISO 9001:2015Quality management systems

    Requirements for a quality management system built on process control, risk-based thinking and continual improvement.

    How we apply itEvery stage ends at a written gate with an owner, and design QA against the approved source before anything is called done.

  • GDPRGeneral Data Protection Regulation (EU) 2016/679

    Lawful basis, data-subject rights, data protection by design and by default, breach notification and DPIAs for high-risk processing.

    How we apply itResearch participants give recorded, specific consent; recordings and notes have a retention date and are deleted on it.

  • DPDP Act 2023Digital Personal Data Protection Act, 2023

    Notice and consent, duties of data fiduciaries, rights of data principals, breach intimation and added duties for significant data fiduciaries, with the DPDP Rules.

    How we apply itConsent notices for India-based participants and users, with data-principal requests answerable from the research log.

Services & packages

Buy the decision, not the deck.

Commission a short diagnostic, a shaped solution or a standing advisory relationship. Each one is scoped up front and ends in something your leadership team and your engineers can both act on.

Categories
04
Services
14
Packages
04
Not sure what you need? Describe the problem

How to buy

  1. 01Pick services. Enquire about one, or add several to a brief.
  2. 02Choose how to engage. A sprint, a fixed project or an ongoing team.
  3. 03Send the brief. We reply within one working day.

Browse by category

Timelines are typical. Every quote follows a written scope.

01Assess

4 services
Typical timeline: 2–4 weeks

Product experience audit

An independent expert review of your live product against the journeys that matter, read alongside the analytics you already have.

What’s included

  • Expert review of three to five key journeys
  • Analytics, search and support-ticket read
  • Severity-rated findings with evidence
  • Ranked fix backlog with effort and impact
  • Diagnostic
  • Ranked backlog

Best forTeams who know the product underperforms but not where.

Typical timeline: 2–5 weeks

Accessibility audit (WCAG 2.2 AA)

Your product tested against WCAG 2.2 AA by automated tools and by hand, with each failure explained in terms of who it blocks.

What’s included

  • Automated scan across representative templates
  • Manual keyboard and screen-reader passes
  • Findings mapped to WCAG 2.2 success criteria
  • Prioritised remediation backlog
  • Retest of fixed findings
  • WCAG 2.2 AA
  • Manual testing
  • Retest
  • Playwright

Best forOrganisations answering a procurement, tender or policy requirement.

Typical timeline: 3–5 weeks

Design & research maturity review

How your design and research practice actually works today, scored against what the roadmap will demand of it in a year.

What’s included

  • Interviews across design, product and engineering
  • Scorecard across research, design, systems, accessibility and measurement
  • Comparison with the roadmap ahead
  • Twelve-month capability plan
  • Scored baseline
  • Capability plan

Best forDesign and product leaders making a case for investment.

Typical timeline: 2–4 weeks

Journey & drop-off review

Where people leave, in which step and on which device, read from your own analytics and session data rather than guessed at.

What’s included

  • Funnel and journey analysis from your analytics
  • Session replay and heat-map review
  • Tracking gaps that hide the real picture
  • Shortlist of experiments worth running
  • Analytics
  • Funnels
  • Experiments

Best forTeams with traffic and conversion that does not match it.

02Shape the solution

4 services
Typical timeline: 3–5 weeks

Solution shaping & option appraisal

Two or three routes to the same outcome, each drawn as a journey and a system sketch and sized with engineers, so the comparison is like for like.

What’s included

  • Current-state journey and system map
  • Two or three routes at equal depth
  • Effort, running cost and risk range per route
  • Recommendation with the rejected options recorded
  • Options
  • Decision-ready

Best forLeadership teams about to commit budget to a large build.

Typical timeline: 1–2 weeks

Design sprint

One or two weeks that take an ambition from argument to a prototype real customers have used.

What’s included

  • Framing session with the decision makers
  • Concept work and a clickable prototype
  • Five to eight customer sessions
  • A go, adjust or stop recommendation
  • 1–2 weeks
  • Tested with users

Best forTeams stuck between competing ideas and short of evidence.

Typical timeline: 3–6 weeks

Concept feasibility & costing

A concept taken far enough to be costed: the experience, the systems it touches, the data it needs and what it would take to run it.

What’s included

  • Concept designs at the depth needed to estimate
  • Systems, data and integration assessment
  • Effort range with named assumptions
  • Build, buy or defer recommendation
  • Feasibility
  • Costed range

Best forTeams asked for a number before anyone has designed the thing.

Typical timeline: 3–6 weeks

Platform & tooling selection

Build, buy or compose, decided against the journeys the platform has to support and what your team can run without outside help.

What’s included

  • Requirements written as journeys, not feature lists
  • Shortlist with a scored comparison
  • Hands-on evaluation or vendor demo scripts
  • Recommendation with switching costs stated
  • Build · buy · compose
  • Scored

Best forOrganisations choosing a CMS, commerce, portal or product platform.

03Ways of working

3 services
Typical timeline: 4–8 weeks

Design operations set-up

Intake, critique, handover and design QA set up so the quality of a piece of work does not depend on who picked it up.

What’s included

  • Intake, prioritisation and critique rituals
  • Design QA and handover standards
  • File, library and naming structure
  • Tooling and permissions clean-up
  • DesignOps
  • Ways of working

Best forDesign teams growing past the point where everything fits in one conversation.

Typical timeline: 3–5 weeks

Design team & role design

The shape of the team the roadmap needs: roles, seniority mix, where designers sit relative to product and engineering, and what to hire first.

What’s included

  • Current team and workload assessment
  • Target team shape with role profiles
  • Hiring sequence and interview guidance
  • Career and craft progression framework
  • Org design
  • Role profiles

Best forLeaders building or restructuring an in-house design function.

Typical timeline: 4–8 weeks

Research practice set-up

A research habit your team can keep: a participant panel, consent and privacy handled properly, a repository and a regular cadence.

What’s included

  • Recruitment and participant panel set-up
  • Consent, incentive and data-retention process
  • Research repository and tagging
  • Templates, training and a standing cadence
  • Continuous discovery
  • Repository

Best forTeams who research in bursts and lose what they learned.

04Advisory

3 services
Typical timeline: Ongoing · quarterly

Accessibility programme

A standing programme that takes a product from an audit finding list to WCAG 2.2 AA held over time, with your own team doing more of it each quarter.

What’s included

  • Audit, remediation plan and component-level fixes
  • Checks added to the design and build pipeline
  • Team training for designers, writers and engineers
  • Accessibility statement drafted for you to publish
  • Quarterly re-audit and progress report
  • WCAG 2.2 AA
  • Ongoing
  • Training
  • Playwright

Best forOrganisations with an accessibility obligation and no in-house specialist.

Typical timeline: Ongoing · monthly

Design advisory retainer

A senior design and product voice available to your leadership every month: reviews, second opinions and help with the decisions that do not fit a project.

What’s included

  • Named senior advisor
  • Monthly review of work in progress
  • Critique and decision support on request
  • Quarterly written read on the practice
  • Retainer
  • Senior advisor

Best forIn-house design leaders who need an experienced outside view.

Typical timeline: 1–2 weeks including preparation

Leadership experience workshop

A facilitated day that puts your leadership team inside the customer experience they own, and ends with the three things they will change.

What’s included

  • Pre-work: journey evidence and customer clips
  • Facilitated session with your leadership
  • Prioritised change list with owners
  • Follow-up note and a check-in
  • Workshop
  • One day

Best forExecutive teams a long way from the product their customers use.

Your brief

Tick “Add to brief” on any service, choose a package, then continue. Or enquire about one service directly.

Start a project

Ways to engage. Same team, same standard.

Three ways in, from a two-minute question to a formal RFQ. Each is read in full by the lead for the work, and anything already in your brief goes with it.

Or book a thirty-minute call

What are you sending?

  1. 01

    About 2 minutes4 required answers

    For a first conversation, a press request, or anything that does not need a scope yet.

    You get A reply from a lead, not a sales queue

  2. 02Most useful

    About 8 minutes5 short steps

    Goals, audiences, a budget band and timing. Enough for us to come back with a shape, not only questions.

    You get Options and a first scope after one call

  3. 03

    About 15 minutesYour documents attached

    Your pack, your deadlines, and the procurement and security rules the work must meet.

    You get Receipt confirmed and a named bid lead

How it is priced

Each package shows how it is priced. Every engagement starts with a written scope and a quote agreed before work begins.

  • Typical length
    1–3 weeks
    Pricing
    Fixed fee
  • Typical length
    4–12 weeks
    Pricing
    Fixed price
  • Typical length
    Ongoing · 6-month minimum
    Pricing
    Monthly fee
  • Typical length
    6–18 months
    Pricing
    Programme fee · by statement of work
Compare what each package includes
What every engagement package includes, and who it suits
PackageEvery engagement includesBest for
SprintOne fixed question, answered in one to three weeks.
  • Scope and outcome agreed before day one
  • One senior lead and the specialists the question needs
  • A working review every week
  • A decision-ready output, not a status deck
Discovery, a diagnostic, a prototype or a decision you need to make soon
ProjectA defined scope, delivered for a fixed price.
  • Statement of work with deliverables and acceptance criteria
  • A named project lead and a fixed team
  • A shared plan with dated checkpoints
  • Source files and IP transferred on delivery
Work you can describe up front: an identity, a system, a set of tools
RetainerReserved monthly capacity to run, improve and extend what we built.
  • A reserved block of team time every month
  • Agreed response times for requests and fixes
  • A monthly review and a rolling backlog
  • Continuous improvement, not just upkeep
Brands and products after launch that need a steady team without hiring one
EnterpriseA multi-workstream programme with governance, a dedicated team and SLAs.
  • An engagement director and a steering group
  • A dedicated team across several workstreams
  • Service levels, reporting and a risk register
  • Security, legal and procurement reviews built into the plan
Large organisations running change across markets, portfolios or business units

Questions

Asked before we compare the routes.

Anything else goes straight to the people who would do the work.

Ask a question
Q01What is the difference between consulting and a discovery project?

Consulting starts with a decision you have to make and ends with a recommendation you can act on. Discovery starts with a problem space and ends with a scoped plan for building. One often leads to the other, and we scope them separately so the advice stays independent of the build.

Q02Can you work with our existing design team?

Yes, and that is the usual case. We work alongside your designers, researchers and product managers, and part of the output is a better way for them to work once we leave.

Q03How do you estimate effort without a specification?

Routes are sized with the engineers who would build them, using reference points from comparable work, explicit assumptions and a range rather than a single number. The assumptions are written down so the estimate can be corrected as each one is tested.

Q04Do you run accessibility audits?

Yes. A WCAG 2.2 AA audit combines automated checks with manual keyboard and screen-reader passes on the journeys that matter, and produces a prioritised backlog rather than a list of violations. Conformance is a statement you publish about your product; no one issues a certificate for it.

Q05What if the honest recommendation is to do nothing?

Then that is what the report says, with the reasoning and the conditions that would change it. An assessment that can only ever recommend a project is not worth commissioning.

Let’s build what happens next.

Tell us what you’re building. We’ll answer straight.